摘要
本文结合日照疏港铁路跨疏港大道特大桥架梁施工,根据单线简支T梁和架桥机倒装龙门的结构形式、倒装T梁时的受力分析,采取了在T梁上加装架桥机倒装龙门专用底座,再将倒装龙门支立在专用底座上,以便有效地解决长大桥T梁换装这一难题,不仅大大提高了架梁施工效率,而且有效保证了架梁施工安全。本文为类似施工提供了借鉴和参考。
Based on the erection construction of Super Large Bridge over Shugang Avenue in Rizhao Shugang railway,the structural form of single-track simple supported t-beam and Gantry Crane t-beam and the analysis of the forces acting on inverted t-beam,a special base for Gantry Crane is installed on t-beam,then Gantry Crane is erected on the special base,so as to effectively solve the problem of t-beam reloading of the long-span bridge,which not only greatly improves the construction efficiency of erecting the beam,but also effectively ensures the construction safety of erecting the beam.This article provides reference for similar construction.
作者
赵明
Zhao mMing(The fFifth Pproject Co.,Ltd.of China Railway Bureau 14 Group,jJining shandong 272117,Shandong Province,China)
出处
《建筑与装饰》
2022年第3期123-125,共3页
Construction & Decoration
关键词
单线铁路
长大桥梁
架梁
桥上换装
single-track railway
long-span bridge
girder erection
bridge reloading