2Chen Z,Li H,Wong C T C.EnvironalPlanning:Analytic Network Process Model for Environmentally Conscious Construction Planning[J].J.Construction Engineering and Management,2005,131(1):92-101.
3Henderson R D.Air pollution and construction equipment[M].SAE-Paper 7000551.1970.
4U S.Environmental Protection Agency (U.S.EPA).Noise from construction equipment and operations,building equipment,and home appliances,Athens,Ga,1971.
5McCullough C A,Nicklen R R.Control of water pollution during dam construction[J].J.Sanit.Eng.Div.,Am,Soc.Civ.Eng.,1971,97(1):81-89.
6Spivey D A.Construction solid waste.J.Constr.Div.,Am.Soc.Civ.Eng.,1974a,100(4):501-506.
7Warren F H.Environmental impact on project schedules[J].Eng.Issues,1973,99(3):299-306.
8Dodds P J,Sternberger R S.The evolution of an environmental monitor[J].Civ.Eng.(N.Y.),1992,62(6):56-58.
9Spivey D A.Environment and construction management engineers[J].J.Constr.Div.,Am.Soc.Civ.Eng.,1974b,100 (3):395-401.
10Henningson J C.Environmental management during construction[J].J.Constr.Div.,Am.Soc.Civ.Eng.,1978,104 (4):479-485.