期刊文献+

考虑兼职用工的呼叫中心坐席人员排班问题 被引量:2

Shift scheduling and rostering problem of call centers with part-time shift consideration
原文传递
导出
摘要 近年来,呼叫中心企业在人力排班中搭配使用兼职人员;兼职人力无论成本或工作模式都与全职坐席人员不同.针对企业实践场景,构建考虑兼职用工的坐席人员排班问题整数规划模型.在分析认识问题优化结构规律基础上提出两阶段优化算法.该算法通过分解日期和班次决策降低问题求解复杂性,通过表征不同类型人力满足话务有效需求的量化指标,局部优化地生成可用排班方案;然后运用具有模拟退火或贪婪机制的邻域搜索技巧来改善前阶段生成的排班方案.计算表明提出的算法能够获得企业规模问题的优化排班方案.最后分析各种因素如何影响兼职用工优化策略.研究表明科学合理使用兼职人力能够有效降低排班用工成本. In recent years,call centers incorporate part-time manpower into their schedule tables.Parttime manpower is different from full-time agents in cost and work mode.An integer programming model is constructed under this actual scenario.A two-stage optimal algorithm is proposed based on analyzing and recognizing the optimization structure of the problem.The algorithm adopts the idea of decomposed decisions of day and shift on-duty to reduce the complexity for solving the problem,and assigns full-time and part-time shifts by using the different metrics that cover human resource requirements of intervals to generate available solution.Then,the algorithm uses neighborhood search techniques with simulated annealing mechanism or greedy mechanism to improve the generated solution.The computational experiments illustrate that the proposed algorithm can obtain optimization schemes of the enterprise-scale instances.Finally,how various factors affect optimization strategies of part-time manpower is analyzed.The research shows that scientific and rational use of part-time manpower can effectively reduce the cost of schedule tables.
作者 王秀利 王瑞程 胡修武 WANG Xiuli;WANG Ruicheng;HU Xiuwu(School of Economics and Management,Nanjing University of Science and Technology,Nanjing 210094,China)
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2022年第1期198-210,共13页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71871118)。
关键词 呼叫中心 兼职/全职人力 人员排班 优化算法 call center part-/full-time manpower shift scheduling and rostering optimal algorithm
  • 相关文献

参考文献4

二级参考文献32

  • 1Koole G, Pot A. Approximate dynamic programming in multi-skill call centers[J]. Proceedings of the 2005 Winter Simulation Conference, 2005: 576-583.
  • 2Avramidis A N, Chan W, L'Ecuyer P. Staffing multi-skill call centers via search methods and a performance approximation[J]. IIE Transactions, 2009, 41: 483-497.
  • 3Pisacane O. Agent scheduling in a multiskill call center[D]. Cosenza, Italy: University della Calabria, 2008.
  • 4Helber S, Henken K. Profit-oriented shift scheduling of inbound contact centers with skills-based routing, impa- tient customers, and retrials[J]. OR Spectrum, 2010, 32: 109-134.
  • 5Buist E, Chan W, L'Ecuyer P. Speeding up call center simulation and optimization by Markov chain uniformiza- tion[J]. Proceedings of the 2008 Winter Simulation Conference, 2008: 1652-1660.
  • 6Bhulai S, Farenhorst-Yuan T. Optimal balanced control for call centers[J]. Annals of Operations Research, 2012: 39 62.
  • 7Milln-Ruiz D, Ignacio Hidalgo J. A memetic algorithm for workforce distribution in dynamic multi-skill call centers[J]. 10th European Conference, EvoCOP 2010,Jstanbul, Turkey, 2010:178 189.
  • 8Omari T, AL-Zubaidy H. Call center performance evaluation[J]. Electrical and Computer Engineering, 2005: 1805-1808.
  • 9Palm C. Research on telephone traffic carried by full availability groups[M]. Tele, 1957.
  • 10Riordan J. Stochastic service systems[M]. Wiley, 1961.

共引文献24

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部