大断面暗挖车站施工工法优化比选研究 被引量:1

Study on optimization comparison and selection of construction methods for large section mined station
下载PDF
导出
摘要 通过对深圳地铁8号线一期工程深外高中站2种大断面暗挖法(即九步开挖的双侧壁法和台阶法)不同的施工工序进行数值模拟模型比选分析,选择能够较好适应车站不同的地质条件,满足安全施工的施工工序,为现场施工提供指导。结合施工监测数据可知,施工过程的拱顶沉降和水平收敛实测值与数值模拟计算所得的结果较为接近,从而验证数值模拟的合理性,以及2种方法施工工序的地质条件适应性。 Through the comparison and analysis of two different construction processes of the super large section mining method in Shenzhen foreign language high school station of Shenzhen metro line 8 phase I project,the double sidewall method and bench method of nine-step excavation were analyzed by numerical simulation.Construction processes adapted to different geological conditions of the station and ensuring construction safety were selected to provide guidance for on-site construction.Combined with the construction monitoring data,the vault settlement and horizontal convergence value in the construction process verified the rationality of numerical simulation and the adaptability of geological conditions of the construction steps of double sidewall method and bench method of nine-step excavation method.
作者 祖玲娜 Zu Lingna
出处 《现代城市轨道交通》 2022年第1期79-85,共7页 Modern Urban Transit
关键词 地铁 大断面暗挖车站 九步开挖 双侧壁法 台阶法 数值模拟 metro large section mined station nine-step excavation double sidewall method bench method numerical simulation
  • 相关文献

参考文献9

二级参考文献70

共引文献485

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部