期刊文献+

长采购提前期的CONWIP模式下基于库存利用率的生产运作管理研究 被引量:1

A Study on Production Operation Management Based on Inventory Utilization Rate under CONWIP Mode with Long Purchase Lead Time
下载PDF
导出
摘要 文章提出了一种使用库存利用率作为评价指标的生产运作管理方法,并通过模拟仿真表明:库存利用率是调控CONWIP制造系统的有效工具,与传统的基于成本的生产库存管理策略相比,库存利用率指标更易于实施和应用.研究发现:在库存利用率很低时,系统会出现零配件库存积压;而利用率高时,库存短缺往往会产生较长的生产提前期. This paper proposes a production operation management method using the inventory utilization rate as a performance evaluation index.The simulation results show that the inventory utilization rate is an effective tool to regulate the CONWIP manufacturing system,and that compared with the traditional cost-based production inventory management strategy,the new method using the index of inventory utilization rates is easier to implement and apply.The study finds that inventory utilization is also an effective tool to monitor the performance of the overall manufacturing system of enterprises:when the inventory utilization rate is very low,the system will have a backlog of spare parts;when the rate is high,inventory shortages often lead to longer production lead time.
作者 何彤 朱玮炜 HE Tong;ZHU Wei-wei(Guangdong Polytechnic Normal University,Guangzhou Guangdong 510665)
出处 《广东技术师范大学学报》 2021年第6期30-34,67,共6页 Journal of Guangdong Polytechnic Normal University
关键词 CONWIP 库存利用率 绩效指标 CONWIP inventory utilization rate performance index
  • 相关文献

参考文献3

二级参考文献27

  • 1Wang D,Product Planning Control,1996年,7卷,3期,236页
  • 2Lee L C.A comparative study of the push and pull productions systems [J]. International Journal of Operations and Production Management, 1989, 9 (4):5-18.
  • 3Spearman M L, Woodruff D L, Hopp W J. CONWIP: A Pull alternative to Kanban [J]. International Journal of Production Research,1990, 28(5):879- 894.
  • 4Takahshi K,Nakamura N. Push, Pull, or hybrid control in supply chain management [J]. International Journal of computer integrated manufacturing, 2004,17(2):126-140.
  • 5Ovallea O R, Marquezb A C. Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains[J]. International Journal of Production economics , 2004,83:195-215.
  • 6Takahashi K , Myreshka, Hirotani D. Comparing CONWIP synchronized CONWIP, and Kanban in complex supply chains [J]. International Journal of Production economics , 2004,93-94:25-40.
  • 7Spearman M L,Woodruff D L & Hopp W J.CONWIP:A Pull Alternative to Kanban[J].International Journal of Production Research,1990,28(5):879-894.
  • 8Wang D,Chen X & Li Y.Experimental Push/Pull Production Planning and Control System[J].Production Planning and Control,1996,7(3):136-142.
  • 9Deleersnyder J L,Hodgson T J,Muellen H,et al.Kanban controlled pull system:An analysis approach[J].Management Science,1989,35(9):1079-1091.
  • 10Sarker B R,Fitzsimmons J A.The performance of push and pull systems:a simulation and comparative study[J].International Journal of Production Research,1989,27(11):1715-1732.

共引文献7

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部