摘要 从控制方式、调档逻辑、电压控制、滑档保护等方面说明了特高压换流站中500 kV换流变压器、750 kV联络变压器、110 kV及66 kV站用变压器有栽调压机构的动作逻辑;结合实际案例,分析了与换流变压器励磁涌流相关的二次保护措施,针对档位不一致和分接头故障等情况提出了处理建议。最后在不进行技改的前提下,提出了运行维护相关建议。 The on load regulating mechanism action logic of 500 kV converter transformer,750 kV interconnecting transformer,110 kV and 66 kV station transformers in UHV converter station is explained from the aspects of control mode,shifting logic,voltage control and sliding protection.Combined with the practical cases,the secondary protection measures related to inrush current of converter transformer are analyzed,and some suggestions are put forward to deal with the situation of inconsistent gear position and tap joint failure.Finally,some suggestions on operation and maintenance are put forward without technical modification.
作者 康颖 武艺维 陈天璐 KANG Ying;WU Yiwei;CHEN Tianlu(Yikezhao Converter Station of State Grid East Inner Mongolia Maintenance Company,Ordos 017000,China)
出处 《内蒙古电力技术》 2021年第S01期33-38,共6页 Inner Mongolia Electric Power
关键词 特高压换流站 变压器 分接头 励磁涌流 档位不一致 UHV converter transformer tap excitation inrush current inconsistent gear
  • 相关文献

参考文献9

二级参考文献68

共引文献338

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部