复杂环境条件下深基坑施工,工法的选择往往成为决定工期、成本等方面的重要因素。文章以某深基坑工程施工作业为例,通过不同部位,选择不同工法,从施工要点的控制和结果的对比,对TRD工法和CSM工法进行分析,并得出相应的结论。
In the construction of a deep foundation pit under complex environmental conditions,the selection of construction method tends to be the critical factor to determine the construction period and cost.Taking the construction of a deep foundation pit as an example,this paper selects different construction methods through different parts,analyzes TRD construction method and CSM construction method from the control of construction points and the comparison of results,and draws corresponding conclusions.