TRD工法和CSM工法在古城区复杂环境中应用分析 被引量:3

Application and Analgsis on TRD Method and CSM Method in Complex Environment of Ancient City
下载PDF
导出
摘要 复杂环境条件下深基坑施工,工法的选择往往成为决定工期、成本等方面的重要因素。文章以某深基坑工程施工作业为例,通过不同部位,选择不同工法,从施工要点的控制和结果的对比,对TRD工法和CSM工法进行分析,并得出相应的结论。 In the construction of a deep foundation pit under complex environmental conditions,the selection of construction method tends to be the critical factor to determine the construction period and cost.Taking the construction of a deep foundation pit as an example,this paper selects different construction methods through different parts,analyzes TRD construction method and CSM construction method from the control of construction points and the comparison of results,and draws corresponding conclusions.
作者 吴永辉 WU Yong-hui(ZYF Construction Group Co.,Ltd,Suzhou Jiangsu 215000 China)
出处 《江苏建筑》 2021年第S02期14-16,共3页 Jiangsu Construction
关键词 深基坑 重点难点 工法选择 过程控制 对比总结 deep foundation pit difficulties selection of construction methods process control summary comparison
  • 相关文献

同被引文献18

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部