1680 m^(3)高炉全铸铁生产开炉实践

OPENING PRACTICE OF 1680 m^(3)BLAST FURNACE FULL CAST IRON PRODUCTION
下载PDF
导出
摘要 柳钢中金公司新建2号高炉于2021年5月10日点火送风,铁水全铸块,开炉前制定了详细有效的生产组织方案,开炉配料计算精确,炉温调控及时合理,铸铁工序采取有效技改措施,高炉和铸铁工序生产平衡有序,顺利达成了预期目标。 Zhong jin company’s 1680 m^(3) blast furnace was put into operation on May 10,2021,which adopt molten iron product iron block.The preparatory work such as developed detailed effective production organization plan,reasonable material calculation,furnace temperature control timely and reasonable,cast iron process to take effective technical measures,the blast furnace and cast iron production balanced and orderly,and finallly achieved the anticipate.
作者 唐超 Tang Chao(Zhong Jin Stainless Steel Company Limited of Guang Xi Liu Zhou Steel,Yulin 537624,China)
出处 《冶金信息导刊》 2022年第1期30-33,共4页 Metallurgical Information Review
关键词 高炉 铸铁 开炉 方案 达产 blast furnace cast iron blowing plan reached production
  • 相关文献

参考文献1

二级参考文献2

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部