针对煤电厂湿法脱硫废水零排放处理工艺展开研究,分析零排放处理系统在运行期间存在的各方面问题,整理相关工作经验,总结了更经济、更高效、更安全的处理工艺。
This article conducts research on the zero-discharge treatment process of wet desulfurization wastewater from coal power plants,analyzes various problems of the zero-discharge treatment system during operation,sorts out relevant work experience,and summarizes a more economical,more efficient and safer treatment process.
出处
《化工设计通讯》
CAS
2022年第2期52-54,共3页
Chemical Engineering Design Communications
关键词
零排放
处理工艺
湿法脱硫
脱硫废水
zero discharge
treatment process
wet desulfurization
desulfurization wastewater