摘要
针对深部强采动巷道围岩变形严重问题,以建新矿4203回风巷为工程背景,采用FLAC;数值模拟软件模拟了巷道在受掘进扰动及二次回采扰动时分别采用"短锚杆+长锚索"、"长锚杆+短锚索"、"长锚杆+短锚索+卸压"3种方案后巷道的应力分布规律和巷道围岩的变形规律。结果表明:加长锚杆长度可有效降低顶板变形量,卸压可有效改善巷道围岩应力坏境。并在4203回风巷设置了试验段,证明了长锚固和卸压协同控制对巷道变形量的控制和应力环境的改善具有明显效果。
In view of the serious deformation of surrounding rock of deep strong mining roadway,this paper takes 4203 return airway in Jianxin Mine as the engineering background,and uses FLAC;numerical simulation software to simulate the stress distribution law of roadway and the deformation law of surrounding rock of roadway after three schemes of“short bolt+long anchor cable”,“long bolt+short anchor cable”and“long bolt+short anchor cable+pressure relief”are adopted when the roadway is disturbed by tunneling and secondary mining.The results show that increasing the bolt length can effectively reduce the roof deformation,and pressure relief can effectively improve the stress environment of roadway surrounding rock.The experimental section was set up in 4203 return airway,which proved that the collaborative control of long anchorage and pressure relief had obvious effect on the control of roadway deformation and the improvement of stress environment.
作者
金声尧
崔琦
邓金平
杨兴国
王苏健
赵世帆
刘文静
JIN Shengyao;CUI Qi;DENG Jinping;YANG Xingguo;WANG Sujian;ZHAO Shifan;LIU Wenjing(Shaanxi Coal and Chemical Technology Institute Company Limited,Xi'an 710100,China;The National Joint Engineering Research Center of the Green,Safe and Efficient Coal Mining,Xi'an 710065,China;School of Mines,China University of Mining and Technology,Xuzhou 221116,China)
出处
《煤矿安全》
CAS
北大核心
2022年第1期110-115,共6页
Safety in Coal Mines
基金
陕西省自然科学基础研究计划企业联合基金资助项目(2019JLZ-04)。
关键词
强采动
长锚固
卸压
应力分布
数值模拟
围岩控制
strong mining
long anchorage
pressure relief
stress distribution
numerical simulation
surrounding rock control