摘要
公路工程建设周期长,由于公路工程主要建设材料单价涨幅较大,设计方案的调整和优化,征地拆迁等政策调整,这些原因导致工程造价增幅较大,根据工程实际情况,调整估算是必要的。对501省道六合雄州至西坝港区段的估算调整的原因进行了分析。
The engineering construction period of highway is long. The engineering cost is greatly increased due to these reasons of great unit price increase of the main construction materials for the highway engineering, adjustment and optimization of design scheme, and policy adjustment of land acquisition. Based on the actual engineering situation, it is necessary to adjust the estimation. The reasons of estimation adjustment for the section from Liuhe Xiongzhou to Xiba Port Area in Provincial Highway 501 are analyzed.
出处
《城市道桥与防洪》
2022年第1期253-255,M0022,共4页
Urban Roads Bridges & Flood Control
关键词
一级公路
工程造价
估算调整
Class I highway
engineering cost
estimation adjustment