摘要
为确定泥质软岩弃渣路堤沉降特性,结合施工案例进行监测分析、制定监测方案、布置测点对路堤施工各个阶段的沉降速率、全断面变形进行监测。分析监测结果,得出路堤底部在填筑施工阶段沉降量较大,路堤中部和上部在稳定阶段沉降量较大,但完工阶段沉降量较小,说明路基结构稳定,施工质量满足要求。
In order to determine the settlement characteristics of the muddy soft rock spoil embankment,monitoring and analysis were carried out in combination with construction cases.Develop a monitoring plan and arrange measurement points to monitor the settlement rate and full-section deformation at each stage of the embankment construction.Analyzing the monitoring results,it is concluded that the bottom of the embankment has a large settlement during the filling and construction phase,and the middle and upper part of the embankment has a large settlement during the stable phase,but the settlement during the completion phase is small,indicating that the subgrade structure is stable and the construction quality meets the requirements.
作者
赵丽娜
ZHAO Lina(Shanxi Road and Bridge Sixth Engineering Co.,Ltd.,Shanxi Jinzhong 030600 China)
关键词
泥质软岩弃渣
路堤
沉降速率
全断面沉降
muddy soft rock spoil
embankment
settlement rate
full-face settlement