摘要 以杭州临江垃圾焚烧工程为例,介绍了该项目的设计亮点,并从建筑去工业化、工艺系统、烟气治理等方面进行分析和探讨,类比分析了国内规模最大的两项目的特点,为类似的焚烧发电项目设计提供参考。 Taking Hangzhou Linjiang waste-to-energy plant project as an example,the design issues of this project are introduced.This paper makes analysis and discussion in aspects of de-industrialization,process system and flue gas treatment,etc.Meanwhile the characteristics of the two biggest scale waste-to-energy plants are compared in order to put forward some proposals for reference.
作者 王德锋 冯志翔 蔡银科 陈培 WANG De-feng;FENG Zhi-xiang;CAI Yin-ke;CHEN Pei(Zhejiang Environmental Protection Group Co., Ltd., Hangzhou 310000, China;China United Engineering Co., Ltd., Hangzhou 310052, China;Hangzhou Linjiang Environmental Energy Co., Ltd., Hangzhou 310005, China)
出处 《应用能源技术》 2022年第1期36-40,共5页 Applied Energy Technology
关键词 垃圾焚烧厂 设计亮点 waste-to-energy plant design issues
  • 相关文献

参考文献1

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部