摘要 建立了南京过江盾构隧道三维模型,对施工掘进过程进行仿真分析。在盾首和盾尾采用生死单元的方法处理开挖面土体和衬砌单元刚度的变化。结果表明随着盾构机的掘进与盾尾管片拼装的持续进行,衬砌支护作用逐渐生效,变形趋于稳定,新的衬砌管片完成拼装后处于中部的管片应力峰值逐渐减小并最终稳定。 A three-dimensional model of a river crossing shield tunnel in Nanjing was established,and the construction and tunneling process was simulated and analyzed.The method of life and death unit is used in the shield head and tail to deal with the changes in the stiffness of the excavation surface soil and the lining unit.The results show that as the tunneling of the shield machine and the assembling of the shield tail tube segment continue,the lining supporting effect gradually takes effect and the deformation becomes stable.After the new lining segment is assembled,the peak stress of the middle segment gradually decreases and eventually stable.
作者 刘坦 王新定 胡韧 李冰 Liu Tan;Wang Xinding;Hu Ren;Li Bing(Beijing Zhongtie Fangshan Bridge Co.,Ltd.,Beijing 102400,China;School of Transportation,Southeast University,Nanjing 211189,China)
出处 《山西建筑》 2022年第5期129-131,共3页 Shanxi Architecture
关键词 盾构隧道 掘进施工 有限元分析 围岩变形 shield tunnel excavation construction finite element analysis surrounding rock deformation
  • 相关文献

参考文献3

二级参考文献42

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部