为了更好地提升施工质量,要结合实际工程项目的操作流程,利用高弹性PE填充模块辅助电气接线盒暗装操作能大大提升效率。文中结合案例,分析了工法的特点和原理,讨论了混凝土线盒线管预埋施工具体方案,并对管理措施提出了几点建议。
In order to better improve the construction quality,it is necessary to combine the operation process of the actual project,and use the high elastic PE filling module to assist the concealed installation operation of the electrical junction box,which can greatly improve the efficiency.Combined with cases,this paper analyzes the characteristics and principle of construction method,discusses the specific construction scheme of concrete junction box and conduit embedding,and puts forward some suggestions on management measures.