摘要 介绍500 kV东坡变电站站用交流电源系统改造前后的变化,阐述其改造原则如开关选型、负荷分类配置、二次回路改造、保护配合及选择性实现等,对改造实施过程各停电阶段关键风险点进行分析,并总结验收过程注意事项。 This paper Introduces the difference after the reconstruction of the station AC power supply system for 500 kV Dongpo substation.Expound the reconstruction principles including breaker selection,load classification,secondary circuit transformation and protection coordination etc.Analyze the key risk points at the each power off stage in reconstruction.Summarize the matters needing attention in test and acceptance.
作者 张莉珠 ZHANG Lizhu(Foshan Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Guangdong Foshan 528000,China)
出处 《农村电气化》 2022年第2期14-19,共6页 Rural Electrification
关键词 站用交流电源系统 改造原则 风险分析 验收 station AC power supply system reconstruction principle risk analysis test and acceptance
  • 相关文献

参考文献1

二级参考文献4

  • 1宋继成.220~500kV变电所电气接线设计[M]北京:中国电力出版社,2004.
  • 2上海超高压输变电公司.变电运行[M]北京:中国电力出版社,2005.
  • 3王燕;邓小玉;段新辉.广东电网公司变电站站用交流电源系统技术规范[S]广州:广东电网公司,2009.
  • 4骆洁艺;黄健洪;黄书荣.广东电网公司35kV及以上变电站运行管理标准实施细则[S]广州:广东电网公司,2010.

共引文献4

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部