期刊文献+

基于GIS的电力数字勘测单兵系统设计与实现

Design and Realization of Electric Power Digital Survey Individual Soldier System Based on GIS
下载PDF
导出
摘要 在电力设计勘测阶段,为了确定杆塔位置,须在实地位置钉上木桩。在杆塔施工时,也须根据木桩位置进行杆塔施工安装,上述措施,除产生实体定桩所需经济费用外,还会导致杆塔建设区域老百姓由于实体桩的存在,而违规搭建、种植树木等行为,从而增加了项目通道清理费用。利用GIS和高精度导航设备,构建电力数字勘测单兵系统,系统在实际项目中应用表明,单兵系统使用后,可去掉杆塔实地定位而进行的钉木桩工作,提高了项目进度,节省了成本,可为其他地区电力勘测设计提供技术思路。 In the electric power design and survey stage,in order to determine the position of the pole and tower,it is necessary to nail the wooden pile on the site position.During the construction of the pole and tower,the pole and tower construction and installation should also be carried out according to the position of the wooden pile.In addition,it will also lead to illegal construction and planting of trees due to the existence of physical piles in the construction area of the poles and towers,thereby increasing the cost of clearing the project passages.Use GIS and high-precision navigation equipment to construct an electric digital surveying individual soldier system.The application of this system in actual projects shows that after the individual soldier system is used,the pegging work for the field positioning of the poles and towers can be removed,which greatly improves the project The progress of the project saves costs and can provide technical ideas for power surveys in other regions.
作者 江华 JIANG Hua(Jiaxing ShuKe Surveying and Mapping Technology CO.,Ltd.,Zhenjiang Jiaxing 314000,China)
出处 《农村电气化》 2022年第2期59-62,共4页 Rural Electrification
关键词 高精度定位 GIS 定桩 电力勘测 High-precision positioning GIS fixed stake electricity survey
  • 相关文献

参考文献5

二级参考文献22

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部