摘要
随着混凝土新型外加剂的研发和施工新设备的出现,碾压混凝土筑坝技术在高坝和恶劣自然环境条件下得到广泛应。以赞比亚下凯富峡水电站碾压混凝土重力坝为项目依托,对快速筑坝关键技术进行归纳和总结,为类似项目设计施工提供参考。
With the development of new concrete admixtures and the emergence of new construction equipment,RCC dam construction technology can also be widely used in high dams and harsh natural environment.Based on the RCC gravity dam of the Kafue Gorge Lower Hydropower Station in Zambia,the key technologies for rapid dam construction are summarized to provide a reference for the design and construction of similar projects.
作者
刘沐
Liu Mu(China Water Resources and Hydropower Eleventh Engineering Bureau Co., Ltd., Zhengzhou 450001,China)
出处
《西北水电》
2021年第6期91-97,共7页
Northwest Hydropower
关键词
下凯富峡
碾压混凝土
重力坝
快速筑坝
关键技术
Kafue Gorge Lower Hydropower Project
RCC
gravity dam
rapid dam construction
key technology