期刊文献+

电子回旋共振加热稳态运行控制系统设计

Design of Steady Operation Control System of Electron Cyclotron Resonance Heating
下载PDF
导出
摘要 为了实现EAST上电子回旋共振加热(ECRH)系统在长脉冲放电下的稳态运行,设计了一套ECRH稳态运行控制系统。该系统通过多种模式切换,运用重新启动和多组回旋管轮流运行的方案提高ECRH系统在EAST装置的400~1000s长脉冲放电过程中的连续运行能力。本设计采用NI CompactRIO及其组件作为下位机,使用LabVIEW语言编写程序。本系统响应迅速,时序准确,能够实现长脉冲放电下ECRH系统的稳态运行。 In order to realize the steady-state operation of the electron cyclotron resonance heating(ECRH)system on EAST under long pulse discharge,a set of ECRH steady-state operation control system is designed.The system uses multiple modes of switching,restarting and multiple groups of gyrotrons in turn,to improve the continuous operation of the ECRH system during the 400—1000 s long pulse discharge process of the EAST device.This design uses NI CompactRIO and its components as the lower computer,and uses Lab VIEW to write programs.The system responds quickly,with accurate timing,and can achieve steady-state operation of the ECRH system under long pulse discharge.
作者 胡涛 徐旵东 徐伟业 杨永 冯建强 胡怀传 张健 HU Tao;XU Han-dong;XU Wei-ye;YANG Yong;FENG Jian-qiang;HU Huai-chuan;ZHANG Jian(Institute of Plasma Physics,Hefei Institutes of Physical Science,Chinese Academy of Sciences,Hefei 230031;University of Science and Technology of China,Hefei 230026)
出处 《核电子学与探测技术》 CAS 北大核心 2021年第4期645-650,共6页 Nuclear Electronics & Detection Technology
基金 国家重点研发计划(2017YFE0300401) 中国科学院合肥物质科学研究院院长基金(YZJJ2020QN10)资助。
关键词 电子回旋共振加热系统 稳态运行 重新启动 LABVIEW Electron Cyclotron Resonance Heating System Steady-state Operation Restart Lab VIEW
  • 相关文献

参考文献1

二级参考文献18

  • 1Wail B. 2009, Nucl. Fusion, 49:104011.
  • 2Hu C. 2012, Plasma Sci. Technol., 12:567.
  • 3Zhao L, Shan J, Liu F, et al. 2010, Plasma Sci. Tech- nol., 12:118.
  • 4Zhao Y, Zhang X, Mao Y, et al. 2014, Fusion Eng. Des., 89:2642.
  • 5Kasparek W, Brand P, Braune H, et al. 2005, Fusion Eng. Des., 74:243.
  • 6Igami H, Kubo S, Shimozuma T, et al. 2010, Fusion Sci. Technol., 58:539.
  • 7Lohr J, Gorelov Y A, Kajiwara K, et al. 2005, Fusion Sci. Technol., 48:1226.
  • 8Leuterer F, Manich M, Brandl F, et al. 2009, Fusion Sci. Teclmol., 55:31.
  • 9Zhou J, Rao J, Li B, et al. 2010, Status of tile ECRH system on HL-2A. Proceeding of EC- 16 hosted by ASIPP in Sanya, China, p.52, DOI: 10.1142/9789814340274_0005.
  • 10Joung M, Han W, Kim ,1, et al. 2010, Commission- ing and operation results of 110 GHz ECH system in KSTAR. Proceeding of EC-16 hosted by ASIPP in Sanya, China, p.58, DOI:10.1142/9789814340274_0006.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部