摘要
目前世界水轮发电机组已经进入单机1000 MW时代,并且机组运行性能良好。得益于50年来机组从无到有、从小到大、从引进吸收到拥有自主知识产权,中国水轮发电机组安装和调试技术进入世界之巅。本文以中国水电四局为背景,详细论述了各个时代中国巨型水轮发电机组的安装和调试技术。
At present,the world's hydraulic turbine generator sets have entered the era of single generator with power of 1000 MW,and the sets have good operation performance.Thanks to the 50 years*development of the unit from scratch,from small to large,and from the introduction and absorption to the possession of independent intellectual property rights,the installation and commissioning technology of hydro generating units in China has entered the top of the world.This paper discusses in detail the installation and commissioning technology of Chinese giant hydro generator sets in each era with the background of Sinohydro Bureau 4.
作者
吉振伟
JI Zhen-wei(Electromechanical Installation Branch o£Sinohydro Bureau 4 Co.,Ltd.,Chengdu,610091,China)
出处
《水电站机电技术》
2021年第S02期1-5,162,共6页
Mechanical & Electrical Technique of Hydropower Station
关键词
巨型水轮发电机组
安装和调试技术
各个时代
中国水电四局
giant hydro generator set
installation and commissioning technology
various eras
Sinohydro Bureau 4