期刊文献+

TBM 在煤系地层瓦斯及不良地质条件下的施工技术 被引量:4

Construction Technology of TBM under Gas and Unfavorable Geological Conditions in Coal Stratum
下载PDF
导出
摘要 在新疆YE供水二期输水工程KS段IX标TBM施工中,TBM因进入煤系地层,发生了瓦斯含量超标事件,通过采取“探、改、测、排”的原则对隧洞瓦斯进行治理,再采用超前管棚施工、轻质混凝土回填及新型化灌等方式,TBM最终顺利通过穿煤段不良地层,避免了施工过程中的安全及工期滞后等风险。 During the TBM construction of Water Conveyance ProjectⅡof YE water supply in Xinjiang,gas content exceeded the standard due to TBM entering the coal measures stratum.This paper adopts the principle of"exploration,modification,measurement and drainage"to control tunnel gas.Through advanced pipe shed construction,light concrete backfilling and new chemical grouting,TBM eventually passes through unfavorable strata in the coal-crossing section smoothly.It avoids risks such as safety during construction and time lag.
作者 滕春俑 康斌 彭飞 林德文 李华平 张进益 TENG Chun-yong;KANG Bin;PENG Fei;LIN De-wen;LI Hua-ping;ZHANG Jin-yi(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第2期151-154,共4页 Yunnan Water Power
关键词 TBM 煤系地层 瓦斯 不良地质 TBM coal stratum gas unfavorable geology
  • 相关文献

参考文献9

二级参考文献40

共引文献42

同被引文献28

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部