期刊文献+

450 m^(3)高炉冶炼富锰渣开炉实践

BLOW-IN PRACTICE OF SMELTING MANGANESE-RICH SLAG IN 450 m^(3) BLAST FURNACE
下载PDF
导出
摘要 介绍了450 m^(3)高炉冶炼富锰渣开炉及生产效益的经验,通过开炉前的精心筹备,制定科学合理的炉前渣铁处理工艺,科学测定送风、无料钟布料等基础技术参数,严格选择技术操作参数等,最终制定合理的开炉方案,顺利生产富锰渣。 The paper introduces the experience of smelting manganese-rich slag in 450 m^(3) blast furnace and its production benefits.Through careful preparation before blow-in,it makes scientific and reasonable arrangement of casthouse operation on slag and iron treatment process,scientifically determines basic technical parameters such as air supply,bell-less distribution,etc.,strictly selects technical operation parameters and finally formulates a reasonable blow-in scheme to produce manganese-rich slag smoothly.
作者 雷金碧 马宁 LEI Jinbi;MA Ning(Ningxia Shengyan Group Energy Recycling Economy Co.,Ltd.,Shizuishan 753200,China)
出处 《铁合金》 2022年第1期1-7,共7页 Ferro-alloys
关键词 高炉 开炉参数 开炉进程 富氧喷煤 渣处理 blast furnace blow-in parameters blow-in process injection of pulverized coal with oxygen enriched blast slag treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部