跨既有线70.52m钢结构桁架天桥整体吊装施工技术

Integral Hoisting Construction Technology of 70.52m Steel Structure Truss Flyover Across Existing Line
下载PDF
导出
摘要 本文以新建凌海南站天桥整体吊装工程为实例,详尽的论述了在既有线施工大吨位、大跨度钢结构桁架天桥的技术特点、施工工艺流程、现场构件拼装制作关键技术、钢结构构件的运输方式、拼装场地选取、400t履带吊拼装场地、场地布置、吊装顺序及走行线路等内容。 This paper takes the overall hoisting project of the newly built Lingnan Railway Station flyover as an example,and discusses in detail the technical characteristics,construction process,key technologies of on-site component assembly and fabrication,and steel structural components in the construction of large-tonnage and long-span steel structure truss flyovers on existing lines.The transportation method,the selection of the assembly site,the assembly site of the 400t crawler crane,the site layout,the hoisting sequence and the running route,etc.
作者 王超 WANG Chao(China Railway No.9 Bureau Group First Engineering Co.,Ltd.,Shenyang 110000,China)
出处 《价值工程》 2022年第7期105-108,共4页 Value Engineering
关键词 跨既有线 钢结构 桁架天桥 整体吊装 施工技术 spanning existing line steel structure truss flyover integral hoisting construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部