期刊文献+

卡洛特水电站枢纽布置设计 被引量:4

Layout design of Karot Hydropower Station
下载PDF
导出
摘要 巴基斯坦卡洛特水电站工程具有地震烈度高、坝址区岩性软弱、泄洪规模大、泥沙问题突出等复杂基础建设条件和建设开发背景。卡洛特枢纽工程主要包括挡水建筑物、泄洪消能建筑物、引水发电建筑物和导流建筑物,枢纽布置方案经过了充分的方案比较和模型试验论证。围绕枢纽布置方案涉及的水文泥沙、地形地质、施工组织、运行管理等要素,系统介绍了卡洛特水电站枢纽布置设计的重点和难点,并提出了相应的解决方案,旨在为类似工程枢纽布置设计提供有益的启示。 Pakistan Karot Hydropower Station has complex infrastructure construction conditions,such as high seismic intensity,weak lithology at dam site,large flood discharge scale and prominent sediment problems.The project mainly consists of water retaining structure,water discharge and energy dissipation structure,hydropower structure and diversion structure.The project layout has been proved by adequate scheme comparison study and model test.This paper focused on hydrology,sediment,topography and geology,construction organization,operation management and other elements involved in the project layout design,systematically introduced the emphases and difficulties in the layout design and put forward the corresponding solutions.This research can provide useful inspiration for similar hydropower projects.
作者 杨启贵 孔凡辉 万云辉 张超 YANG Qigui;KONG Fanhui;WAN Yunhui;ZHANG Chao(CISPDR Corporation,Wuhan 430010,China;Changjiang Survey,Planning,Design and Research,Co.,Ltd.,Wuhan 430010,China)
出处 《人民长江》 北大核心 2022年第2期132-137,共6页 Yangtze River
基金 国家重点研发计划项目“300 m级特高土石坝建设与安全保障技术”(2017YFC0404805)。
关键词 枢纽布置 沥青混凝土心墙堆石坝 模型试验 泄洪消能 卡洛特水电站 hydro-junction layout asphalt concrete core rockfill dam model test flood discharge and energy dissipation Karot Hydropower Station
  • 相关文献

参考文献6

二级参考文献38

  • 1周冰.冰雪融水型多沙河流水库泥沙设计[J].水利水运科学研究,1994(1):37-43. 被引量:2
  • 2殷宗泽,朱泓,许国华.土与结构材料接触面的变形及其数学模拟[J].岩土工程学报,1994,16(3):14-22. 被引量:393
  • 3姜乃森,傅玲燕.中国的水库泥沙淤积问题[J].湖泊科学,1997,9(1):1-8. 被引量:38
  • 4Zhou J J.Schemes of sediment management proposed for the Three Gorges Project(TGP)[A].Proc.,9th International Symposium on River Sedimentation[C].October 18 ~ 21,2004:250 ~ 257.
  • 5Mahmood K.Reservoir Sedimentation-Impact,Extent and Mitigation[M].World Bank Technical Paper Number 71.Washington,D.C.1987.
  • 6中华人民共和国水利部.中国河流泥沙公报(长江、黄河)[R].2001(1).
  • 7得查马洛夫,阿卡耶夫.山区河流的水库淤积[A].勃利兹尼亚克主编,河床演变(论文集)[C],水利水电科学研究院技术处译,北京:科学出版社,1965:245~253.
  • 8夏震寰,韩其为,焦恩泽.论长期使用库容[A].1st International Symposium on River Sedimentation[C].Beijing China,1980:753 ~ 762.
  • 9ZHOU Jianjun and LIN Bingnan.1D mathematical model for suspended sediment by lateral integration[J].Journal of Hydraulic Engineering.ASCE,1998,124(7):712 ~ 717.
  • 10ZHOU Jianjun and LIN Bingnan.Verification of model for sediment transport by unsteady flow in the Lower Yellow River[J].International Journal of Sediment Research,2003,19 (4):278 ~ 291.

共引文献92

同被引文献58

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部