摘要
阐述110kV变电站施工中的问题和应对措施,基于设备安装案例分析,探讨设备安装方法过程,包括施工准备、验收复测、设备本体组装、GIS连接、母线安装、设备调整。
This paper expounds the problems and Countermeasures in the construction of 110 kV substation. Based on the case analysis of equipment installation, this paper discusses the method and process of equipment installation, including construction preparation, acceptance retest, equipment body assembly, GIS connection, bus installation and equipment adjustment.
作者
李晓刚
LI Xiaogang(China Railway 21st Bureau Group Electrification Engineering Co.,Ltd.,Gansu 730000,China)
出处
《集成电路应用》
2022年第1期218-219,共2页
Application of IC
关键词
110KV变电站
设备安装
设备调整
110kV substation
equipment installation
equipment adjustment