结合上海锅炉厂350 MW超临界循环流化床机组辅机故障减负荷试验,深入分析了故障减负荷试验过程中的控制要点及控制策略,针对试验过程中存在的问题,提出了行之有效的解决措施。
Based on the fault load reduction test of auxiliary machine of 350 MW supercritical circulating fluidized bed unit in Shanghai Boiler Plant,the control points and control strategies in the process of fault load reduction test are analyzed in depth.And effective solutions are put forward to deal with the problems existing in the test process.
作者
吕建
杜鸿飞
王映奇
LV Jian;DU Hongfei;WANG Yingqi(Shanxi Shijizhongshi Power Science驭Technology Co.,Ltd.,Taiyuan,Shanxi 030001,China)
出处
《山西电力》
2022年第1期34-38,共5页
Shanxi Electric Power
关键词
循环流化床锅炉
故障减负荷
炉膛负压
引风机
circulating fluidized bed boiler
fault load reduction
furnace draft