摘要
临溪水文站流量测验主要以缆道流速仪法为主,常规测验方式虽能保证流量精度,但测验时间较长,无法满足时效性的要求。因此,本文通过对临溪站多年的缆道流速仪法流量进行测速垂线分析,在常测法基础上提出了流量简测方案,并对前后流量进行了误差分析,测验结果满足规范要求。研究结果可为类似水文站测验提供参考。
The flow test of Linxi Steam Water Station is mainly based on the cableway anemometer method.Although the conventional test method can ensure the flow accuracy,the test time is too long to meet the timeliness requirements.Therefore,in this paper,based on the vertical analysis of the cableway current meter method flow in Linxi Steam Water Station for many years,a simple flow measurement scheme is put forward on the basis of the constant measurement method,and the error analysis of the flow before and after is carried out,and the test results meet the specification requirements.It can provide reference for similar hydrological station test.
作者
胡中南
HU Zhongnan(Anhui Huangshan Hydrology and Water Resources Bureau,Huangshan 245000,China)
出处
《水资源开发与管理》
2022年第2期30-33,共4页
Water Resources Development and Management
关键词
流量测验
测速垂线
简测方案
误差分析
临溪水文站
flow test
velocity vertical line
brief test scheme
error analysis
Linxi Steam Water Station