摘要
电力是国家经济发展和科技进步的重要保障,其中架空输电线路是电力供应中的重要一环,而电力线路的施工,是保障电力安全可靠供应的基础。高压线路输电的基础是高压线路,由于输电线路施工具有一定的危险,这就需要对施工风险点进行分析,采取预控措施保证施工顺利进行。本文对输电线路张力架线施工中器具选择、工艺流程进行分析,希望可以促进架空输电线路张力放线施工技术的发展,总结实际施工中存在的不足,以供参考使用。
Electric power is an important guarantee for national economic development and technological progress,among which overhead transmission line is an important link of electric power supply.The construction of power line is the basis for ensuring safe and reliable power supply.The foundation of high-voltage transmission line is high-voltage line.Because the construction of transmission line has certain risks,it is necessary to analyze the construction risk points and take pre control measures to ensure the smooth progress of construction.This paper analyzes the selection of tools and instruments and technological process in the tension stringing construction of transmission line,hoping to promote the development of tension stringing construction technology of overhead transmission line,and summarize the shortcomings existing in the actual construction for reference.
作者
汪以文
杨少春
单长孝
张志争
张文涛
WANG Yiwen;YANG Shaochun;SHAN Changxiao;ZHANG Zhizheng;ZHANG Wentao(Anhui Power Transmission and Transformation Engineering Co.,Ltd.,Hefei,Anhui Province,230601 China)
出处
《科技创新导报》
2021年第28期38-40,共3页
Science and Technology Innovation Herald
关键词
超特高压架空输电线路
张力放线
施工技术
应用研究
UHV overhead transmission line
Tension pay-off
Construction technology
Application research