期刊文献+

唐山港曹妃甸港区某煤码头堆场封闭大棚设计

Design of Enclosed Greenhouse in Coal Terminal Yard at Caofeidian Harbor of Tangshan Port
下载PDF
导出
摘要 为了解决煤码头堆场煤尘问题,唐山港曹妃甸港区某煤码头堆场采用封闭大棚,从项目建成投入使用后,产生了很好的抑制煤尘外溢的环保效果。封闭大棚建设方案可适用于通用码头煤堆场和专业化码头堆场,有效替代现阶段的防风网抑尘设施,控制粉尘污染效果明显,能极大改善和保护环境,环保效益特别显著,可使企业每年免缴大额排污费。 In order to solve coal dust problem existing in the ancillary yard of coal terminal, closed greenhouses is applied in the yard of coal terminal at Caofeidian harbor of Tangshan port, its application achieves better dust suppression effect after the project is put into operation. The above construction plan may apply to the ancillary coal yard of general-cargo terminal and the yard of specialized terminal, effectively replace the existing dust suppression facilities such as windproof net. The enclosed greenhouse has obvious dust control effect, improves and protects local environment greatly. Significant environmental protection benefit can prevent the enterprises from high pollutant discharging fee each year.
作者 张伟 井一涵 赖雄燕 Zhang Wei;Jing Yihan;Lai Xiongyan(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300220,China)
出处 《港工技术》 2022年第1期12-15,共4页 Port Engineering Technology
关键词 煤码头 堆场 封闭大棚 环保 抑尘 coal terminal stockyard closed greenhouses environmental protection dust suppression
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部