海外大型基础设施投资项目 “关联方施工模式”利弊分析及应用建议

Analysis of the Pros and Cons of "Related Party Construction Mode" in Oversea HydropowerInvestment and Suggestions
下载PDF
导出
摘要 随着中国“一带一路”倡议的实施,中国企业国际化进程加快,参与海外大型基础设施建设项目投资和建设逐渐增多。大型基础设施项目建设投资金额大,建设周期长,技术复杂,选择关联方作为施工承包商已成为投资企业控制建设期风险的措施之一。通过对该模式的优缺点进行研究,并结合巴基斯坦卡洛特水电站项目的应用经验,对投资者是否应该选择该模式及如何管理好该模式提出建议。 With the implementation of China's"One Belt,One Road"strategy,more and more Chinese companies have gone abroad to participate in the investment and construction of infrastructure project in countries along the route.Large infrastructure projects have large investment amounts,long construction periods,and complex technologies.It seems that selecting related parties as contractors has become a solution for investment enterprises to control risks.Through the study of the advantages and disadvantages of this model,combined with experience of Pakistan Karot Hydropower Station project,suggestions to be shared on whether investors should choose this model and how to manage this model.
作者 张军 张向军 刘尚志 ZHANG Jun;ZHANG Xiang-jun;LIU Shang-zhi(Shanghai Survey and Design Research Institute Co.,Ltd.,Shanghai 200438,China;Three Gorges International Energy Investment Group Co.,Ltd.,Beijing 101100,China)
出处 《价值工程》 2022年第9期32-35,共4页 Value Engineering
关键词 关联交易 海外投资 基础设施建设 水电站 巴基斯坦 related party transactions overseas investment infrastructure construction hydroelectric power station Pakistan
  • 相关文献

参考文献1

二级参考文献2

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部