摘要 为研究软土地区顶管下穿既有铁路营业线桥梁对其产生的影响,本文采用Midas-GTS有限元分析软件,对天津市万汇路220 kV电力管线顶管下穿京沪高铁、津秦客专下行联络线施工过程进行三维数值模拟,得出铁路桥墩基础附加变形情况。京沪高铁天津特大桥最大附加竖向、纵向和横向位移均出现在1498号桥墩基础,分别为-0.653 mm、-0.459 mm和-0.923 mm;津秦客专下行联络线1号桥最大附加竖向、纵向和横向位移均出现在16号桥墩基础,分别为-1.013 mm、1.041 mm和1.586 mm,计算结果满足现行规程限值要求,能够保证铁路安全运营。 In order to study the influence of pipe jacking under existing railway business line bridges in soft soil areas,this paper uses Midas-GTS finite element analysis software to conduct 3 D numerical simulation calculation on the construction process of 220 kV power pipeline jacking under the downlink connecting line of Beijing-Shanghai High-Speed Railway and Tianjin-Qinhuangdao Passenger Dedicated Line on Wanhui Road,Tianjin,and obtains the additional deformation of railway pier foundation.The maximum additional vertical,longitudinal and transverse displacements of Tianjin super large bridge of Beijing-Shanghai High-Speed Railway appear in the foundation of pier 1498,which are-0.653 mm,-0.459 mm and-0.923 mm respectively.The maximum additional vertical,longitudinal and transverse displacements of No.1 Bridge on the downlink connecting line of Tianjin-Qinhuangdao Passenger Dedicated Line appear on the foundation of pier 16,which are-1.013 mm,1.041 mm and 1.586 mm respectively.The calculation results can meet the limit requirements in the current regulations and ensure the safe operation of the railway.
作者 李金书 LI Jinshu(China Railway Fifth Survey and Design Institute Group Co.Ltd.,Beijing 102600,China)
出处 《铁道建筑技术》 2022年第2期84-88,共5页 Railway Construction Technology
基金 中铁第五勘察设计院集团有限公司科研计划课题(T5Y2020-B06)。
关键词 桥梁 软土地区 下穿 顶管 安全性 有限元分析 bridge soft soil area under-passing pipe jacking safety finite element analysis
  • 相关文献

参考文献11

二级参考文献66

共引文献233

同被引文献26

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部