4ABBEY C, ROBINSON J, JOOS G. Integrating renewable energy sources and storage into isolated diesel generator supplied electric power systems [C] // Proceedings of International Power Electronics and Motion Control Conference, September 1-3, 2008, Poznan, Poland : 2178-2183.
5BILLINTON R, WANG P. Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply[J]. lEE Proceedings: Generation, Transmission and Distribution, 2001, 148(4): 355-360.
6The IEEE reliability test system 1996[J]. IEEE Trans on Power Systems, 1999, 14(3)~ 1010-1020.
7BILLINTON R, WANG P. Distribution system reliability cost/worth analysis using analytical and sequential simulation techniques[J]. IEEE Trans on Power Systems, 1998, 13(4): 1245-1250.
8LAMBERT T, GILMAN P, LILIENTHAL P. Micropower system modeling with HOMER[M] // FARRET F M, SIMOES M G. Integration of alternative sources of energy, New York, NY, USA: John Wiley & Sons, Inc, 2006: 379-418.
9Wang S,Li Z,Wu L,et al.New metrics for assessing the reliability and economics of microgrids in distribution system[J].IEEE Transactions on Power System,2013,28(3):2852-2861.
10Billinton R,Wang P.Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply[J].IEEE Proceedings:Generation,Transmission and Distribution,2001,148(4):355-360.