短线法节段梁预制和架设施工质量控制技术研究 被引量:2

Study on Quality Control Technology of Prefabrication and Erection ofSegmental Beams with Short-line Method
下载PDF
导出
摘要 短线法预制施工和"先简支后连续"的节段拼装架设施工工艺复杂,施工难度高,质量控制难度大,有必要对其施工质量控制关键技术进行深入研究。本文以某高架桥项目为工程依托,对测量、混凝土浇筑、预应力工程、节段梁涂胶、临时张拉几个关键工序进行施工质量控制技术研究,在实际施工中取得了良好的成效,可为今后类似工程的施工提供参考。 Short-line method of prefabrication and segmental erection of"Simple Supporting before Continuous Joints"are complex,with high construction difficulty and high quality control difficulty,so it is necessary to conduct in-depth study on the key technologies of construction quality control.Taking a viaduct project as the case,this paper studies the construction quality control technology of several key steps,such as survey,concrete pouring,prestressing,segmantal beam gluing and temporary tensioning.The case study has achieved good results in practice and can provide reference for similar projects in the future.
作者 王晓磊 WANG Xiaolei(China Railway Three Bureau Group Guangdong Construction Engineering Co.,Ltd.,Guangzhou 510630,China)
出处 《高速铁路技术》 2022年第1期108-112,共5页 High Speed Railway Technology
关键词 短线法 节段梁 预制 架设 质量控制 short-line method segmental beam prefabrication erection quality control
  • 相关文献

参考文献7

二级参考文献43

共引文献43

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部