摘要
机场快线动车工程,采用预制箱梁施工,极大缩短工期,机场快线动车工程对施工精准度控制严格,因此应确保箱梁预制时平整度及架设后桥梁线性满足要求。基于某机场快线工程中的分部线路高架区间工程,针对箱梁预制各施工工艺进行分析,保持箱梁平整度,严格控制梁体裂缝产生,并阐述了箱梁现场架设详细步骤,对采用提梁机及架桥机等设备架设进行研究,确保桥梁线性满足要求,为后续类似箱梁工程提供参考。
Prefabricated box girder is used in the construction of Airport Express Railway Project,which not only shortens the construction time greatly.Because the precision of the construction of the Airport Express Car is strictly controlled,the flatness of the box girder should be ensured and the linearity of the erected bridge should meet the requirements.Based on the elevated section project of the subsection line of an International Airport Express Railway Project,the paper analyzes the construction technology of the box girder precast,maintains the smoothness of the box girder,strictly controls the occurrence of cracks in the girder,and expounds the detailed steps of the onsite erection of the box girder,studies the erection of the equipment such as the girder lifting machine and the bridge erecting machine,so as to ensure the linearity of the bridge and provide reference for the similar box girder projects.
作者
田涛
王伟
Tian Tao;Wang Wei
出处
《建筑技术开发》
2022年第5期72-74,共3页
Building Technology Development
关键词
箱梁预制
架设施工
提梁机
架桥机
box girder prefabrication
erection construction
girder lifting machine
bridge erecting machine