期刊文献+

何家沟水库除险加固工程消能墩体型和位置优化研究

Study on shape and position optimization of energy dissipation pier in danger elimination and reinforcement project of the Hejiagou Reservoir
下载PDF
导出
摘要 消力池的结构优化设计有助于提高消能效果,保证泄水建筑物的安全稳定运行,具有重要的工程意义和价值。文章以辽宁省凌源市何家沟水库除险加固工程为例,利用数值模拟的方式,探讨了消能墩墩型和位置对消能效果的影响。综合模拟计算结果,建议工程设计中在消力池的池尾设置T型消能墩。 The structural optimization design of stilling basin is helpful to improve the energy dissipation effect and ensure the safe and stable operation of discharge structures,which has important engineering significance and value.Taking the danger removal and reinforcement project of the Hejiagou Reservoir in Lingyuan,Liaoning,as an example,this paper discusses the influence of energy dissipation pier type and location on energy dissipation effect by means of numerical simulation.Based on the simulation results,it is suggested to set T-shaped energy dissipation pier at the end of the stilling basin in the engineering design.
作者 付云鹏 Fu Yunpeng(Lingyuan water conservancy project management station,Lingyuan City,Chaoyang 122500,Liaoning)
出处 《吉林水利》 2022年第2期59-62,共4页 Jilin Water Resources
关键词 消能墩 消力池 消能效果 何家沟水库 energy dissipation pier stilling basin energy dissipation effect Hejiagou Reservoir
  • 相关文献

参考文献8

二级参考文献50

共引文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部