摘要 海洋工程当前正处于快速发展阶段,施工项目多,工期要求紧张,伴随着工作量的攀升,质量压力骤增,如何在项目赶工期间开展质量控制工作,提高施工质量是当前海洋钢结构建造阶段质量控制工作的一项重大挑战,文章针对海洋平台建造赶工过程质量控制方法进行分析,得出一套合理的赶工阶段开展质量控制工作的方法。 Offshore engineering is currently in a rapid development stage.There are many construction projects and tight schedule requirements.With the increase in workload,the quality pressure has increased sharply.How to carry out quality control work during the project rush to improve the construction quality is the current ocean steel structure construction a major challenge for stage quality control work.This article will analyze the quality control methods of the offshore platform construction and rush work process,and draw a set of reasonable methods for quality control work in the rush work stage.
作者 杜虹 陈强 吴连强 文海龙 乔侠 DU Hong;CHEN Qiang;WU Lian-qiang;WEN Hai-long;QIAO Xia(Offshore Oil Engineering Co.,Ltd.,Tianjin 300461,China)
出处 《化工管理》 2022年第7期161-163,共3页 Chemical Engineering Management
关键词 海洋工程 质量控制 合理方法 ocean engineering quality control reasonable method
  • 相关文献

参考文献2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部