9Blazewicz J, Eeker K H, Schmidt G, et al. Scheduling in Computer and Manufacturing Systems [M]. Second Revised Edition. Springer-Verlag, 1996.
10Blum C, Samples M. When model bias is stronger than selecti on pressure[C]//Proceedings of the 7th International Conference on Parallel Problem Solving from Nature(PPSN'02), Springer Verlag, Berlin, Germany, LNCS2439,2002: 893 -902.