摘要
为了提升综合性医院机电工程建设质量,探讨了综合性医院机电工程安装施工技术的优化措施,从安装技术、施工技术、通风管道三方面分析了综合性医院机电工程安装的基础性要求,提出了综合性医院机电工程安装施工技术的优化措施:合理安装弱电系统、科学安装电气设备、严格开展质量控制、明确施工流程、加大现场监管力度,进而全面提升综合性医院机电工程建设质量,提升电气安装的安全性和机电工程运行效率。医疗行业服务与建设水平的日趋提升,促使相关人员在开展综合性医院机电工程安装施工中,要适时改进施工技术,提升施工质量,提升电气安装的科学性,增强机电工程的整体建设质量和运行效率。
In order to promote the electromechanical engineering construction in the comprehensive hospital,the study explores the optimization countermeasures of electromechanical engineering installation construction technology in the comprehensive hospital,and analyzes the basic requirements from three aspects:installation and construction technology,and air conduit.Optimization countermeasures of electromechanical engineering installation construction technology in the comprehensive hospital are proposed,i.e.to rationally install weak current system,scientifically install electrical equipment,strictly develop quality control,clarify construction process,and strengthen on-site supervision,in order to comprehensively promote the electromechnical engineering construction quality of the comprehensive hospital,and promote the safety of electrical installation and the operating efficiency of electromechanical engineering.With the increasing improvement of the service and construction level of the medical industry,relevant personnel should timely improve the construction technology,improve the construction quality,improve the scientificity of electrical installation,and enhance the overall construction quality and operation efficiency of electromechanical engineering in the installation and construction of electromechanical engineering in the comprehensive hospital.
作者
仲仕蛟
钟伟
Zhong Shijiao;Zhong Wei(The 2nd Affiliated Hospital of Bengbu Medical College, Bengbu 233000, China)
出处
《黑龙江科学》
2022年第4期80-81,共2页
Heilongjiang Science
关键词
综合性医院
机电工程
安装施工技术
Comprehensive hospital
Electromechanical engineering
Installation construction technology