1[7]China seismological bureau.2000.code of hydraulic fracturing and overcoring method for in -situ stress method (DB/T14-2000),SciencePress (in chinese).
2[8]Haimson B C.1978.The hydrofracturing stress measuring method and recent results.Int.J.Rock Mech.Min.Sci.Geomech.Abstr.15,167~178.
3[9]Institute of crustal dynamics,CSB.2005.Report on in-situ stress measurements for Jiagou Bauxite,Henan (in chinese).
4[10]K Hayashi,et al.1991.Characteristics of shut-in curves in hydraulic fracturing stress measurements and determination of in situ stress minimum compressive stress.J.G.R.96(B11):18,311~18,321.
5[11]Li Manzhou,Wang Jihua,Tie Pingju.2004.Report on the mechanism of water burst and water depression test for Jiagou Bauxite,Henan (in chinese).
6[12]Study on the Generation and extension of the induced fractures by hydraulic fracturing.1999.Seismological Press (in chinese).
7[13]Wu Manlu,Zhang Chunshan,Liao Chunting.2005.Stress measurement and Fenghuoshan tunnel.Acta Geoscientica Sinica,26(1):71~74.