摘要
结合超高层建筑项目工程塔楼结构施工实际,探讨了钢框架-混凝土核心筒结构建筑施工技术措施。通过使用整体附着式升降脚手架代替悬挑脚手架、使用内爬式塔式起重机代替外部附着式塔式起重机,并对布料机进行加固,实现了工程的顺利进行。总结的经验可为类似工程提供借鉴。
Combined with the practice of tower structure construction of super high-rise building project,the construction technical measures of steel frame concrete core tube structure are discussed.By using the integral attached lifting scaffold instead of the cantilever scaffold,using the internal climbing tower crane instead of the external attached tower crane,and strengthening the concrete distributor,the smooth progress of the project is realized.The experience summarized can provide reference for similar projects.
作者
夏鑫
XIA Xin(Shanghai Construction No.1(Group)Co.,Ltd.,Shanghai 200120,China)
出处
《建筑施工》
2022年第2期280-281,296,共3页
Building Construction