期刊文献+

百吨转炉汽化烟道整体更换施工技术分析

Analysis of the Construction Technology for the Overall Replacement of the Vaporization Flue of a 100-ton Converter
下载PDF
导出
摘要 转炉运行期间,随着运行时间的延长,汽化烟道会出现漏水情况,如果未及时进行处理,漏水逐渐严重后,转炉的正常运转必然会受到影响。为保证转炉的正常运行,要对其进行整体更换。以某百吨转炉汽化烟道整体更换施工为例,对所用施工技术及更换流程进行论述。 During the operation of the converter, with the extension of the operation time, the vaporization flue will leak water, if it is not treated, the normal operation of the converter will inevitably be affected when the water leakage becomes serious. In order to ensure the normal operation of the converter, it must be replaced as a whole. Taking the overall replacement of the vaporization flue of a 100-ton converter as an example to discuss the construction technology and replacement process used.
作者 王华钊 WANG Huazhao(Fujian Sangang Group Co.,Ltd.,Sanming Fujian 365000)
出处 《河南科技》 2021年第29期50-52,共3页 Henan Science and Technology
关键词 转炉 汽化烟道 整体更换 施工技术 converter vaporization flue overall replacement construction technology
  • 相关文献

参考文献4

二级参考文献7

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部