摘要 基于南京扬子江大道综合管廊工程,采用数值模拟方法,研究在软土地层中双舱顶管下穿已有大直径给水管期间对给水管的影响,对比加固和不加固条件下给水管的变形规律,并对比不同顶力下土体的位移变化情况。研究表明,地层加固可有效减少顶管顶进过程中既有给水管的变形;顶推力的变化对顶管施工所引起的地层变形影响较大。结合有限元分析结果对顶管施工过程中的变形控制措施进行提炼和总结,并在实际工程中验证,为类似工程提供参考。 Based on the Utility Tunnel Project of Nanjing Yangtze River Avenue,the research uses numerical simulation to study the impact of the double-cabin pipe under the existing large diameter water supply pipe in the soft soil layer on the water supply pipe,and compares the deformation laws of water supply pipes under reinforced and unreinforced conditions and the changes in soil displacement under different jacking force.The results show that stratum reinforcement can effectively reduce the deformation of the existing water supply pipe during the pipe jacking process;the change of the jacking force has a greater impact on the soil deformation during jacking process.Combined with the results of numerical calculation,the deformation control measures in the pipe jacking construction process are refined and summarized,and have been verified in actual projects.The research results can provide reference for similar projects.
作者 邢冬冬 敖辉 戴郑新 卢志飞 XING Dongdong;AO Hui;DAI Zhengxin;LU Zhifei(JSTI Group Co.,Ltd.,Nanjing 210019,China;Jiangsu Nanjing Geo-engineering Surveyiec Institute,Nanjing 210041,China)
出处 《现代交通技术》 2022年第1期21-27,共7页 Modern Transportation Technology
关键词 大断面顶管 双舱顶管 小净距顶进 施工控制 large section pipe jacking double-cabin roof pipe small clearance jacking construction control
  • 相关文献

参考文献4

二级参考文献34

  • 1Abe T,Sogimoto Y,Ishishara K.Development and Applica- tion of Environmentally Acceptable New Soft Ground Tunnel- ing Method[]..1978
  • 2Yi Hongwei.Research on Soil Disturbance and Ground Movement Induced by Shield Tunneling[]..1999
  • 3Fang Congqi.Research on the Ground Moving of Pipe Jack- ing Construction Base on Analytical Method[]..1998
  • 4Haslem R F.Pipe-Jacking Forces: from Practice to Theory[]..1986
  • 5Song Yong,Ai Yanqing,Liang Bo.Familiarity ANSYS7.0 Finite Element Analysis[]..2004
  • 6Baosong M,Stein D,Jiang G S.Pipe Jacking & MicrotunnelTechnology[]..2004
  • 7Duan Z Y.Ground Movement Associated with Microtunnel- ling[]..2001
  • 8Chen Qimin.Research Methods on the Prediction of the Ground Settlement Induced by Informatization Construction of Pipe Jacking[]..2000
  • 9Chen Huifa,Yu Tianqing.Civil Engineering Material Consti- tutive Equations[]..2001
  • 10Milligan G W E,Norris P.Pipe-Soil Interaction during Pipe Jacking[].Proc Instn Civ Engrs Geotech Engng.1999