摘要
根据文物建筑设计原则,历史保护建筑的电气改造要最小干预,新添设备设施要以最小干预为前提,减少对历史建筑本体不可逆的破坏,既要尊重保留历史,又要认真权衡现状,故采用合理可行的方法是重中之重。介绍了160街区项目电气改造中碰到的难点及解决方案,探讨了历史保护建筑电气改造的特点及难点。
Based on the principles of cultural relic architecture conservation planning,the renovation of heritage buildings is required to its least construction.It’s crucial to conduct the reasonable and feasible construction in order to avoid irreversible damage to the historical interest of building,and in the meanwhile,keep it in a good condition.The difficulty and solution of Block 160 project are introduced.The characteristics and problems of electrical renovation of historic preservation are discussed in Block 160 project.
作者
夏乐意
XIA Leyi(East China Architectural Design&Research Institute,Shanghai 200120,China)
出处
《现代建筑电气》
2022年第2期48-51,55,共5页
Modern Architecture Electric
关键词
历史保护建筑
供配电系统改造
防雷系统设计
重点保护区域照明设计
消防系统设计
historic preservation architecture
renovation of power supply and distribution system
lightning protection system design
illumination design of key protected area
fire-fighting system design