摘要
依托国道G228线阳江市江城西平路至儒洞桥段旧水泥路面改造工程,论述了多锤头碎石化工艺设备要求及基本性能要求,分析了多锤头碎石化技术施工要点,总结了质量管理及检查验收关键点。文章的内容以期能为同行在同类型工程建设中,提供一定的技术借鉴。
Based on the reconstruction project of the old cement pavement between Xiping Road and Rudong Bridge in Yangjiang Wuhan on G228 National Road,this paper discusses the technical equipment requirements and basic performance requirements of the multi-hammer head crushed petrochemical process,this paper analyzes on the key points of the construction of the multi-hammer head crushed petrochemical technology,and sums up the key points of the quality management and inspection and acceptance.The content of this article is expected to provide some technical reference for the construction of the same type of projects.
作者
郭智文
Guo Zhiwen(The Seventh Engineering Co.,Ltd.of China Railway 12th Bureau Group,Changsha 410004,China)
出处
《科学技术创新》
2022年第7期97-100,共4页
Scientific and Technological Innovation
关键词
路面改造项目
旧水泥路面
多锤头
碎石化技术
Pavement Reconstruction Project
Old Cement Pavement
Multi-hammer head
Crushed petrochemical technology