期刊文献+

基于全过程管理的医院污水站建设项目实践及探讨

Practice and Discussion of Sewage Station Construction Project based on Whole Process Management
下载PDF
导出
摘要 本文以北医三院西线污水站改造项目为例,明确质量控制对象,引入全过程管理模式,运用SWOT分析模型、AHP层次分析法、4M1E等管理方法,形成从前期调研、设计、运行多阶段的全过程质量管理体系。项目实施过程中,采用先进污水处理工艺,克服场地局限等技术难题,满足了污水处理量与质的需求,缓解医院日益增长的污水处理压力。该项目结合技术与管理,希望为同行提供借鉴思路,推动医院污水处理行业发展。 This paper elaborated the practice of the reconstruction project of west line sewage station in the Peking University Third Hospital.Quality control objects were identified and whole process management mode was introduced.The whole process quality management system covering the stages including preliminary investigation,design and operation was established using SWOT,AHP and 4M1E methods.During the implementation of the project,the hospital used advanced sewage treatment technologies and overcame space limitation,meeting the demand for quantity and quality of sewage treatment and relieving the growing pressure of sewage treatment.The combination of technology and management in the project can provide reference for other hospitals and promote the development of hospital sewage treatment industry.
作者 王金良 闫石 倪学勇 齐婷 田思源 郭嘉羽 WANG Jin-liang;YAN Shi;NI Xue-yong;QI Ting;TIAN Si-yuan;GUO Jia-yu(Peking University Third Hospital)
出处 《医院管理论坛》 2022年第1期88-92,共5页 Hospital Management Forum
关键词 全过程管理 质量管理 污水处理 Whole process management Quality management Sewage treatment
  • 相关文献

参考文献8

二级参考文献26

共引文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部