摘要
随着核电机组百万化,核电凝结水精处理的处理水量不断提升,水质要求提高。为了适应处理更大的水量、更高的水质和延长树脂床的运行周期,研究现有规格柱形设备的处理能力和树脂的装填高度的关系,通过工程应用验证其可行性。
As the number of nuclear power units tends to millions,the volume of condensate water for nuclear power condensate refinement is increasing and the water quality requirements have been improved.In order to adapt to the larger water volumes,higher water quality and prolong the operation cycle of resin beds,we study the relationship between the processing capacity of cylindrical equipment and the filling height of the resin by engineering applications.
作者
朱来松
袁劲梅
ZHU Laisong;YUAN Jinmei(China Electric Environmental Protection Co.,Ltd.,Nanjing 211102,China)
出处
《给水排水》
CSCD
北大核心
2022年第3期80-82,共3页
Water & Wastewater Engineering
关键词
核电
百万机组
凝结水精处理
柱形设备
树脂层高度
超流速
出水硅
Nuclear power
Millions of units
Condensate fine treatment
Cylindrical equipment
The height of resin layer
Super velocity of flow
Effluent silicon