摘要 在水轮发电机组长时间运行中,受到水力、机械、时间等因素的影响,活动导叶立面间隙偏大,活动导叶漏水量偏大。为此结合芒里水电站水力设备实际布置情况,通过在传动部分中加装偏心销连板结构,增设偏心销,增大偏心量,使全部活动导叶具备可调节能力,达到调节活动导叶立面间隙的目的。实践结果表明,该方法效果较好,能有效解决活动导叶立面间隙偏大问题。 During long-term operation of hydro generator,due to the influence of hydraulic,mechanical and time factors,the clearance between elevations of movable guide vanes is large and the leakage of movable guide vanes is large.Combined with the actual layout of hydraulic equipment of mangli hydropower station,by adding eccentric pin connecting plate structure in the transmission part,adding eccentric pin and increasing the eccentricity,all movable guide vanes have adjustable capacity to adjust the vertical clearance of movable guide vanes.The practice results show that this method is effective and can effectively solve the problem of large vertical clearance of movable guide vane.
作者 魏加院 WEI Jiayuan(Datang Mangli Hydropower Develepoment Co.,Ltd.,Dehong 678400,China)
出处 《电工技术》 2022年第3期65-67,共3页 Electric Engineering
关键词 水轮发电机组 活动导叶 偏心销 间隙调整 hydro generator movable guide vane eccentric pin clearance adjustment
  • 相关文献

参考文献4

二级参考文献21

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部