期刊文献+

带电更换三相高压计量保险管辅助操作工具研发

Research and Development of Auxiliary Operation Tools for Live Replacement of Three-phase High Voltage Metering Fuse
下载PDF
导出
摘要 在10kV高压计量保险管被熔断时,通常采取停电处理的方法,但是存在追补电量时间跨度大、计量故障效率低、无法快速恢复供电而影响客户正常生产等问题。本文针对上述问题,提出研发一种辅助操作工具,达到同时带电更换三相高压计量保险管的目的。本文详细讲述了计量保险管故障具体问题及一种不需要停电处理的方案,以提供带电作业更换保险管参考依据。 When 10kV high-voltage metering fuse is blown,it is usually treated by power failure,but there are some problems such as long time span of replenishing electricity,low metering failure efficiency,inability to quickly restore power supply,and so on,which affect the normal production of customers.In view of the above problems,this paper proposes to develop an auxiliary operation tool to achieve the purpose of simultaneously replacing three phase high-voltage metering fuse with live line.The paper describes in detail the specific problems of metering fuse failure and a treatment scheme without power failure,so as to provide reference for replacing fuse with live line operation.
作者 黄智明 霍北季 李岳锋 HUANG Zhiming;HUO Beiji;LI Yuefeng(Jiangmen Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Jiangmen,Guangdong Province,529000 China)
出处 《科技创新导报》 2021年第34期87-89,共3页 Science and Technology Innovation Herald
关键词 三相高压计量保险管 带电更换 辅助操作工具 处理方案 Three-phase high-voltage metering safety tube Live replacement Auxiliary operating tools Processing scheme
  • 相关文献

参考文献3

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部