期刊文献+

苏州中心某办公用户暖通系统测试、调试实例

Testing and Commissioning Project of HVAC System for an Office User in Suzhou Center
下载PDF
导出
摘要 简要介绍二次装修办公项目,从最初设计到最终获得理想暖通系统所经历的主要环节,及测试、调试工作的展开依据。通过苏州中心某办公项目进行实例描述的形式,介绍从前期准备环节到测试、调试环节涉及的要点、各类问题、建议及抉择。总结暖通测试、调试所起到的意义,归纳过程中的有待完善的地方,其中同性的问题希望得到同行的借鉴和预防。 Briefly introduces the general steps of HVAC system for office decoration project from design to final completion and handover.Describe the basic of testing and commissioning.Through the real project description of an office user in Su Zhou center,introduce the key points,main problems,suggestions and the owner’s decision of the preliminary preparation stage,testing and commissioning stage of this project.Summary function and understanding of testing and commissioning and common problems hope to get reference and avoid by who work at same filed.
作者 郏京武 顾苑清 许鹏 JIA Jing-wu;GU Yuan-qing;XU Peng(S.B.I.Facility Services(Shanghai)Co.,Ltd.;Merchant Marine College,Shanghai Maritime University)
出处 《建筑热能通风空调》 2022年第2期79-83,共5页 Building Energy & Environment
关键词 测试调试 VAV 水冷精密空调 水源热泵 风平衡调试 水压气压测试 testing and commissioning VAV water cooled precision AC water source heat pump air balance commissioning water&air pressure test
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部