摘要
阐述了一种新的导管架钢桩装船技术,使用框架结构将多根钢桩打包成一个整体后使用自行式模块化运输车(SPMT)滚装方式进行装船。主要对该技术的原理、框架设计、配车设计、栈桥设计等主要过程进行了详细介绍。该技术极大的提高了装船效率,为后续同类项目的应用提供有益的参考。
Introduces a new load-out technology for Jacket piles,which uses steel frame to pack multiple piles into a whole part and then uses SPMT to load out to barge.The design principle,frame design,SPMT configuration,ramp design and other main process are described in detail.This technology greatly improves the efficiency of load out and provides a useful reference application of similar projects.
作者
吴彬
Wu Bin(Offshore Oil Engineering(Qingdao)Co.,Ltd.,Qingdao 266520,China)
出处
《山东化工》
CAS
2022年第4期154-156,共3页
Shandong Chemical Industry